Here are some images of the jobs done on the boat in April.
Some of the jobs done are:
- Completing triplex deck
- Keel fairing repair
- Sanding the teak in the cockpit and impregnating with teak oil
- Creating saildrive mount
- Planing and sanding the chines, drilling away the filler from the screws and epoxying everything
- Epoxying the bow
- Sanding down most of the old anti fouling
- … and more